There is a road closure in between the roads of Dearing and Cuff, as they are working on the railroad tracks and trying to flatten the road that meets up with the tracks. One of the workers I talked to told me that they are hoping to be done by the first of October, and there is nothing interfering with their work as of September 19th. The road is somewhat damaged by the railroad tracks, and they are trying to flatten it out enough so it no longer feels like a "ramp." From experience of driving over the tracks everyday, I'm glad they are fixing it. I always fear of bottoming out my car when I drive over it.
No comments:
Post a Comment